Eskom is short of generation capacity, particularly over peak periods. While possible to meet reserve margin needs with costly gas turbine generation plant, another more preferable initiative based on voluntary customer load curtailment (NegaWatt generation) was needed.
We developed and implemented a Virtual Power Station (VPS) for Eskom as a mechanism to incentivise customers and enable them to reduce load over critical periods.
Eskom uses the VPS as a means to schedule all its controllable demand side resources and view available customer NegaWatts. A variety of demand response (DR) programmes are being catered for within the VPS, including customers with standby generation and ripple control systems, and a number of Eskom’s largest customers in an interruptible load programme. The VPS interfaces with the Eskom National Control Centre and manages all Eskom VPS customers’ availability, scheduling, dispatching and the gathering of metering information, event performance measurement, settlements and reporting.