An interconnector between South Africa and Botswana is required due to the regional shortfall in generation capacity and congestion on the various transmission lines.
The key drivers for the Botswana-South Africa (BOSA) interconnector were primarily to alleviate congestion on the Matimba-Phokoje-Insukamini line, improve the power pool stability between strong and weak systems, improve system control and reliability, improve regional trading and provide redundancy on the SAPP fibre network. Enerweb partnered with Aurecon on the project, with the Enerweb focus being on the market assessment and SAPP regional business modelling, identifying constrained and unconstrained energy flows across the region under various scenarios.
The objective of the project was to determine the feasibility of the interconnector where a baseline network model had to be developed and the energy to be transmitted via the interconnector be evaluated under various scenarios. Enerweb’s responsibility was the market assessment and SAPP business modelling.
SAPP Market Assessment and Business Modelling (inter-country energy flow). Enerweb covered the following aspects in this comprehensive study: